Company: Nampak
Business: packaging & print
Location: Gillingham, Kent
Nampak commissioned independent testing of the imop to establish the electrical and carbon savings
achievable in their business. The equipment selected was on a printing line and it already had an inverter
installed. The equipment was in use for 16 hours per day, 20 days per month.
Based on the running time of the machine, the electrical savings were identified as 44,928 KWh per annum.
This equates to a 15.96% reduction in the electrical costs for running this piece of equipment. It also
represents a carbon tonne reduction of 24.12tCO2e.
Furthermore, the relationship between the costs of the installation of the imop and the savings achieved meant
a return on investment for Nampak of just 10.8 months.
To view the full report, download the Nampak
imop case study here.
Company: Canary Wharf Group PLC
Business: Retail Area
Location: Canary Wharf, London, UK
To view the full testimonial, download the Canary Wharf Group PLC imop testimonial here.
Company: South Staffordshire Water
Business: Water Authority
Location: Staffordshire, UK
To view the full testimonial, download the South Staffordshire Water imop testimonial here.